LISI | The story continues
2013/04/06 | all news, photogalleries,

After the second week in Weissensee, LISI is slowly taking shape. Ground elements and the cores are already visible. Next week, we plan on having the entire rough construction ready. We look forward to another week of drilling, hammering and sawing. GO TEAM LISI!



Johannes operating a rotary saw while wearing a hathttps://www.solardecathlon.at/wp-content/uploads/2013/04/01_Woche2-361x240.jpg 361w" sizes="(max-width: 920px) 100vw, 920px" />

Claus wearing a helmet, checking some technical drawingshttps://www.solardecathlon.at/wp-content/uploads/2013/04/02_Woche2-361x240.jpg 361w" sizes="(max-width: 920px) 100vw, 920px" />

Two decathletes sawing a piece of wood twohttps://www.solardecathlon.at/wp-content/uploads/2013/04/03_Woche2-361x240.jpg 361w" sizes="(max-width: 920px) 100vw, 920px" />

Roman measuring the distance of between two wooden boardshttps://www.solardecathlon.at/wp-content/uploads/2013/04/04_Woche2-358x240.jpg 358w" sizes="(max-width: 920px) 100vw, 920px" />

Philipp placing insulation between two wood boardshttps://www.solardecathlon.at/wp-content/uploads/2013/04/05_Woche2-358x240.jpg 358w" sizes="(max-width: 920px) 100vw, 920px" />

A decathlete taking a close-up photo with their camera. https://www.solardecathlon.at/wp-content/uploads/2013/04/06_Woche2-358x240.jpg 358w" sizes="(max-width: 920px) 100vw, 920px" />

Wolfgang installing a temporary steel structure to support the corehttps://www.solardecathlon.at/wp-content/uploads/2013/04/07_Woche2-358x240.jpg 358w" sizes="(max-width: 920px) 100vw, 920px" />

Dominik holding a giant beam. He's smiling a littlehttps://www.solardecathlon.at/wp-content/uploads/2013/04/08_Woche2-358x240.jpg 358w" sizes="(max-width: 920px) 100vw, 920px" />

Dominik and Wolfgang installing the wall separating the kitchen and sleeping roomhttps://www.solardecathlon.at/wp-content/uploads/2013/04/09_Woche2-358x240.jpg 358w" sizes="(max-width: 920px) 100vw, 920px" />

The roof of our core is being placed onto the wallshttps://www.solardecathlon.at/wp-content/uploads/2013/04/10_Woche2-358x240.jpg 358w" sizes="(max-width: 920px) 100vw, 920px" />

The entire core is being lifted with a crane and placed into its designated positionhttps://www.solardecathlon.at/wp-content/uploads/2013/04/11_Woche2-358x240.jpg 358w" sizes="(max-width: 920px) 100vw, 920px" />

Yasmin pushing the core into its placehttps://www.solardecathlon.at/wp-content/uploads/2013/04/12_Woche2-358x240.jpg 358w" sizes="(max-width: 920px) 100vw, 920px" />