LISI | Construction Day 4
2013/09/28 | all news, construction, photogalleries,

Today, we placed the cornice elements in their position. They form the basic structure and the framing of the patios and LISI’s semi-public areas. Furthermore, we installed a professional fall protection – praised by our Safety Inspector several times. It makes any work on the roof a lot easier.



Crane lifting off the container.https://www.solardecathlon.at/wp-content/uploads/2013/09/01_Constday04-160x240.jpg 160w, https://www.solardecathlon.at/wp-content/uploads/2013/09/01_Constday04-667x1000.jpg 667w" sizes="(max-width: 920px) 100vw, 920px" />

Project manager Greg explaining the plan for the day.https://www.solardecathlon.at/wp-content/uploads/2013/09/02_Constday04-359x240.jpg 359w" sizes="(max-width: 920px) 100vw, 920px" />

First part of the cornice is being lifted.https://www.solardecathlon.at/wp-content/uploads/2013/09/03_Constday04-361x240.jpg 361w" sizes="(max-width: 920px) 100vw, 920px" />

Solar Decathlete Rainer is pointing at the roof.https://www.solardecathlon.at/wp-content/uploads/2013/09/04_Constday04-359x240.jpg 359w" sizes="(max-width: 920px) 100vw, 920px" />

Inspector Steve Lappi paying a visit.https://www.solardecathlon.at/wp-content/uploads/2013/09/05_Constday04-359x240.jpg 359w" sizes="(max-width: 920px) 100vw, 920px" />

Second part of the cornice being put in place.https://www.solardecathlon.at/wp-content/uploads/2013/09/06_Constday04-361x240.jpg 361w" sizes="(max-width: 920px) 100vw, 920px" />

Side view of a ladder with someone on it.https://www.solardecathlon.at/wp-content/uploads/2013/09/07_Constday04-361x240.jpg 361w" sizes="(max-width: 920px) 100vw, 920px" />

Front view of our house.https://www.solardecathlon.at/wp-content/uploads/2013/09/08_Constday04-361x240.jpg 361w" sizes="(max-width: 920px) 100vw, 920px" />